Before an OEM sheet metal parts order starts, the most useful work is not cutting metal. It is aligning the drawing package, revision control, quality gates, packaging and communication path. This checklist helps purchasing and engineering teams start a project with fewer assumptions and fewer late-stage disputes.

Quick answer: a smooth OEM sheet metal parts kickoff should confirm the approved drawing revision, material and finish, critical dimensions, DFM risks, first article inspection, packaging requirements, lead time assumptions and the person responsible for each approval.
Why a Project Kickoff Checklist Matters
Many sourcing problems begin before production. A supplier may quote from an outdated file, assume a standard tolerance, ignore finish build-up, or pack painted parts in a way that causes transit damage. A short kickoff process turns those unknowns into written requirements before the order becomes expensive to change.
Kickoff Information to Send
| Item | What to include | Why it matters |
|---|---|---|
| Drawing package | PDF plus STEP, DXF or DWG files with revision number. | Prevents wrong-version production and improves DFM review. |
| Material | Grade, thickness, certificate requirement and surface condition. | Controls strength, corrosion resistance, bending and price. |
| Finish | Color code, coating thickness, texture, masking and sample requirement. | Finish build-up can affect threads, hinges and assembly fit. |
| Hardware | PEM nuts, studs, standoffs, hinges, locks, gaskets and labels. | Clarifies supplied parts, installed parts and inspection scope. |
| Inspection | FAI, AQL level, critical dimensions and report format. | Defines what must be approved before shipment or volume production. |
| Packaging | Part protection, carton, pallet, barcode label and moisture control. | Protects cosmetic surfaces and welded assemblies during transport. |

DFM Questions to Ask Before the PO
- Are any holes too close to bend lines or edges?
- Will the bend sequence create interference or tolerance stack-up?
- Will welding distortion affect flatness, door fit or mounting points?
- Do threads, grounding points or gasket surfaces need coating mask protection?
- Are critical dimensions clearly marked for inspection?
- Does packaging need separators, foam, film or wooden pallet protection?
Approval Gates for a First Order
For a new supplier or a new design, do not move straight from quotation to volume production. Use gates that both sides can verify.
- RFQ review: supplier confirms drawings, material, finish, hardware and open questions.
- DFM feedback: buyer approves any drawing or process change before production.
- First article: first parts are checked against critical dimensions and finish requirements.
- Batch inspection: AQL sampling and cosmetic checks are completed before packing.
- Shipment approval: buyer receives inspection and packaging photos before balance payment.
How This Differs From a Service Page
This article is a purchasing workflow checklist. If you need MSTFAB’s full factory capability overview, visit our custom sheet metal fabrication services page. Use this checklist when your team is preparing a real order and wants the handoff from engineering to purchasing to be clearer.
Frequently Asked Questions
What is the first thing to confirm before an OEM sheet metal parts order?
Confirm the exact drawing revision and approved file set. If the supplier starts from the wrong file, every later quality check becomes irrelevant.
Should every project need first article inspection?
For repeat, low-risk parts, not always. For a new supplier, new tooling, tight tolerances, cosmetic finish or welded assembly, FAI is strongly recommended.
What should be written on the PO?
At minimum, include drawing revision, material, finish, quantity, Incoterm, lead time, inspection requirement, packaging requirement and payment milestones.